日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com
What are the specific classification of steel structure workshop
According to the main frame of steel structure workshop, it is generally divided into six categories   The portal steel structure workshop is called portal frame system for short. Its main axis is perpendicular to the horizontal plane, and a l...
2022/2/19
Is the method of the building structure more solid?
The building structure is a kind of force system in the building, made of the building material, which can bear various pressure. According to different building materials, divided into concrete structure, masonry structure, steel structure, light st...
2022/1/22
how to do waterproof steel?
We know that Foshan steel structure is a new type of building structure, the use of the current life is not fully popular. The most used in life or the traditional concrete building.Grid structure is mainly used in some large-scale construction, alth...
2022/1/13
What should we pay attention to in the design of steel structure workshop
[advantages of steel structure workshop] the steel structure workshop has the advantages of light weight, high strength, large span and short construction period. All components can be processed in the factory to realize industrial production and sav...
2021/12/29
How to store steel structures?
Steel structure is made of steel, so storage should be very important, then how to store steel structure? Foshan steel structure tells you:1. Can be stored in many places, such as open air, can also be placed in the warehouse, but must be flat, and h...
2021/12/22
Talk about the matters needing attention in Dongguan steel structure welding
The construction of the city is inseparable from the material of steel structure, which is particularly particular in welding, and there are also welding differences in design and process. Therefore, today we will talk about the matters needing atten...
2021/12/15
How to reinforce the steel structure?
The main method of Foshan steel reinforcement are:Lighten the load, the calculated change in graphics, increase the original structure and the strength of the connection member section to prevent crack propagation and so on. When mature experience, b...
2021/12/8
How to improve the installation accuracy of steel structure workshop
In the construction industry, with the use of steel structure plant more and more popular, steel plant production, transportation and installation of technology more and more attention, but also by the rapid development and continuous improvement. Ho...
2021/12/1
steel construction norms basic provisions
Guangzhou Steel tells you: steel construction norms basic provisions 1, Guangzhou steel construction units should have the appropriate construction qualification steel works and should have the safety, quality and environmental management systems.2,...
2021/11/24
What should be done before installing the steel structure grid?
What should be done before installing the steel structure grid? The installation of steel structure grid is relatively different from the construction of traditional buildings. The installation of steel structure grid has high technical requirements...
2021/11/20
Seven construction processes of steel structure workshop
The main process flow of steel structure plant construction is as follows: 1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation...
2021/11/13
How to see whether a steel structure project is good
How to see whether a steel structure project is good No matter what it is or the design of the project, there are many details. When we want to see whether a steel structure project is good or not, we can first start with the details. For example, w...
2021/11/10
page:5  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
食品快速安全检测仪器厂家价格| 紫外分光光度计()| 乙型网带| 9130原子荧光光度计| 液体微小流量检测仪| 磁力高压反应釜| 双层玻璃反应釜定制| Transfluid液力耦合器| 实验室气流粉碎机| 建筑气密性测试系统| 凸轮轴表面质量检测仪| 数显大电流发生器| 空分节能| 酶标仪厂家| 光学3D轮廓仪| UB型玻璃板液位计| 自动冷滤点测定仪| 潍坊发电机出租| 猪精密度仪| 轮胎式起重机| 畜牧电子地磅秤| 轴流风机罩| 便携式光化学测氧仪| 旋转蒸发器| 核相仪| IHI寿力离心式空气压缩机| 土壤污染检测仪| 欧美进口工业品一站式采购平台| 重庆纸带过滤机| 电子拉力测力仪| 96针洗板机| 伺服油压机厂家| 导电滑触线| VOCs气体稀释装置| AVENTICS气缸| 冲锋衣定做| 便携式表面粗糙度仪| 邯郸水泥制品| 意大利ROLLON伸缩滑轨| 重庆材料研究院| 电缆故障测试仪[精准定位]|