Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:1942

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
血糖试纸包装设备| 湖北高温老化房| 不锈钢电动油桶泵| 荧光灯负载柜| 大型竖式垃圾转运站| elektrophysik测厚仪| WIKA压力控制器| 沙门氏菌PCR检测试剂盒| PES聚醚砜折叠滤芯| 植物油酸| 红外线测温仪| 二手ICPMS等离子体质谱仪| 抗氧剂BHT| 牛羊布病快速检测卡| 橡胶磁条| 氟离子监测仪| 可燃气体检测仪| 往复式给煤机| 油样瓶全自动清洗机| 伍尔特wurth工具| 中频感应加热器| 框架式拉伸液压机| 高气压气体流量计| FZB氟塑料离心泵| 铝末压块机| PE冲孔板| Aurora全光谱流式细胞仪| 顶机式振摆仪| 研祥工控机总代理商| 实验室气体管路系统安装| 色标离心管| 德国BURKERT电磁阀| 低压互感器| 消防七氟丙烷分析气相色谱仪| 往复式新型脱色摇床| 屏蔽泵厂家| 三相五柱电压互感器| 高压氮气减压器| 体视显微镜| 上海贵尔机械| CK6140数控车床厂家|