日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > What should be done before installing the steel structure grid?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

What should be done before installing the steel structure grid?

Time:[2021-11-20]  Hits:1944

What should be done before installing the steel structure grid?

The installation of steel structure grid is relatively different from the construction of traditional buildings. The installation of steel structure grid has high technical requirements for constructors, so preparations should be made before construction. The following small series will specifically introduce what work should be done before installing the steel structure grid.

First of all, as a professional steel structure grid construction company, each construction team should have a series of construction processes and some relevant regulations, that is, whether before or during construction, it should have a perfect system to ensure that each step can be carried out smoothly, It also ensures that each step of inspection can be implemented. Generally, before the construction of steel structure, there will be professional teams and personnel to design the drawings. After the drawings are designed, there will be a number of professionals to discuss and conduct simple experiments on some questions arising from the drawings. Then, after the drawings are basically determined, the raw materials can be purchased. At this time, the raw materials should be strictly compared with the drawings to ensure that the structural size and material of any part are purchased accurately according to the drawings. Of course, in addition to the raw materials needed in some buildings, the auxiliary supplies and tools needed in some buildings also need to be compared and checked one by one.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
T100基因扩增仪| 意大利ATOS电磁阀| 蔬菜烘干加工流水线生产厂家| 空气型电加热器| 斯金纳实验系统| 高速潜水搅拌机厂家| 微机热释光剂量仪(百科)| BA卡套| 横河YTA温度变送器| 试剂存储柜| 顶入式单袋过滤器| VOC超标报警装置| 带钢冲孔机| 自动拧螺丝机厂家| 海绵透气率测试仪| 410圆头钻尾螺丝| VOCS烟包气相色谱仪| 射频电源| 恒温恒湿空调机| 410圆头钻尾螺丝| GPS定位系统| 管道全位置自动焊机| 打磨机专用除尘器| 漩涡高压气泵| 热敏试纸| 沥青混合料成型机| 多探头数字式照度计| 工业移动式吸尘器| 个人射线报警仪| 不锈钢粉体蝶阀| 玻璃化转变温度测试仪| 仿竹| 单相多功能校准器| 隧道铸铝壳体| 全自动高压灭菌器生产厂家| 小型驾驶式洗地机| 无锡进出口代理| 预付费电能管理| 无管道净气型储药柜| 恒温恒湿机| 汽车线束焊接机设备的制造商|