日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News >
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com
Why are steel structure hoisting assembled on the ground
Reliable footholds shall be provided for suspension operation, and protective railings, protective nets or other safety facilities shall be set as appropriate.   The rigging, scaffold, basket, cage, platform and other equipment used for the pr...
2021/3/31
The key points of steel structure construction technology
Manufacturing technology of structural members and special-shaped nodes   Various large-span, complex spatial shapes of steel structure buildings require complex local forces and difficult production of steel components. Therefore, in the cons...
2021/3/20
Reinforcement method of steel structure building
Steel structures are often used in various engineering structures with large spans, large heights, large loads, and large dynamic effects, and have a wide range of applications. With the development of steel structure, its stability becomes more and ...
2021/3/5
Common problems and preventive measures of steel structure installation
The positioning axis of the foundation and the elevation of the supporting steel cylinder exceed the allowable deviation value of the specification The reasons are: There are errors and deviations in the foundation survey control network, foundatio...
2021/2/26
Application examples of steel structure industrial workshop
Application of Electromechanical Anti-seismic in Steel Structure Industrial Factory   In industrial plants, there are public utility pipelines installed for factory process production; such as water supply and drainage, fire fighting system, s...
2020/12/11
How to control the construction quality of steel structure engineering
Make preparations before the project starts   Strengthen the review of construction drawings. The drawings are the basis for the construction of the project. Before the start of the project, the project control agency should organize the contr...
2020/12/2
Analysis and solution of water leakage in steel frame workshop
The slope of the light steel structure roof is generally small, often below 6%. In the rainy areas in Central South, the roof leakage of this structure is more common. There are large areas of water leakage, daylight windows, and drips at the joints ...
2020/11/12
Main points of steel structure plant design
Structural system used in steel structure plant design   Steel structure workshops generally require large space due to process layout requirements. The structure usually adopts a frame structure, and frame-shear structure can also be adopted ...
2020/11/3
What are the advantages of Foshan Steel Structure Project?
the characteristics of the enterprise. In this case, for the enterprise, the construction of the plant is also designed according to the characteristics of the enterprise, and it has also played a certain role in promoting the industry. In addition,...
2020/10/28
Project cost control for wholesale metal building systems
Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the bu...
2020/10/24
Cost control in the design stage of steel structure building
Engineering cost control in material selection   As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-...
2020/10/13
Steel structure building design ideas
Steel structure is usually used for high-rise, large-span, complex body, heavy load or crane lifting weight, large vibration, requiring mobility or frequent assembly and disassembly structures. Intuitively speaking: buildings, stadiums, opera houses,...
2020/9/26
page:7  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  
Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
干式酸性吸附剂生产厂家| 震动给料机厂家| 可燃气体报警器厂家| 蒸气压力试验装置| 射线剂量率仪| 煤质化验分析仪器| 硅橡胶条| 隔膜计量泵| 威海木托盘| 非接触式RFID| 固定污染源温室气体分析仪| 特种电缆生产厂家| 食品拍打式无菌均质| 广式内螺纹球阀| 派克parker液压泵| 氧氮氢分析仪| 高效送风口| 1227杀菌剂| 国产扭力扳手| 电梯门刀| 脱硫脱硝| 六杯型绝缘油介电强度测试仪| 透明质酸试剂盒| 13X分子筛吸附剂| 成都风淋室| 省力加力扳手| 快速尺寸测量仪器| 多环芳烃类标准物质| 淄博海恒机械制造厂| 数控机械内拉床| 电动扭力扳手| 步入式高低温试验箱品牌| 全自动组织快速研磨仪| 超纯水箱| cod智能消解器| 全自动过滤器| Mahr量仪量具| 控氧氮气柜| 磁共振含油量测试仪| 101S集热式磁力搅拌器| REXROTH力士乐泵|