日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > How to ensure the safe use of steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

How to ensure the safe use of steel structure?

Time:[2021-10-13]  Hits:1861

How to ensure the safe use of steel structure?

With the rapid development of factory buildings in China, steel structures are more and more widely used. As we all know, the application of steel structure in plant construction is very important. Therefore, the following problems must be paid attention to when storing and installing steel structures to ensure the safe use of steel structures.

1. The specification, steel number, quantity and material acceptance certificate number of the steel shall be indicated at the end of the steel.

2. When stacking in the open air, the site shall be flat, the height shall be higher than the surrounding ground, and there shall be drainage channels around.

3. During stacking, the back of the steel section shall be upward or outward as far as possible to avoid the accumulation of snow and water. There shall be a height difference between the two ends to facilitate drainage.

4. Before installation, the construction unit shall conduct special inspection on the product certificates, design documents and pre assembly records of parts, and recheck the dimensions of parts.

5. Appropriate connection mode shall be adopted for steel structure to make the node design consistent with the simplified structural calculation model.

6. When hoisting the steel structure, appropriate measures shall be taken to prevent excessive bending and torsional deformation, and washers shall be added to the contact part between the wire rope buckle and the member to prevent the member from being injured.

7. When the steel structure is in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

8. High altitude operators shall use tools, and spare parts shall be placed in the tool bag rather than thrown up and down

9. When working in rainy days, reliable anti-skid measures must be taken, and pay attention to lightning protection in thunderstorm season.

10. The weather conditions before construction are also optimistic, and it is forbidden to use winds of level 4 or above.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
淄博机械| 布袋除尘器厂家| 高低压成套设备厂家| 江苏| REXROTH力士乐柱塞泵维修| 聚氨酯丙烯酸酯| ISG离心管道泵| Elma实验室清洁剂工具A10| 电热丝| 电动推杆| 美国PE光谱耗材| 淄博久增机械| 厂家| 锂电电极粉体软连接| 铝末压块机| 纸箱套袋机| 高速压力机| 小型催化剂挤条机| 自动除锈抛丸机价格| 带湿度恒温箱| 机镗铣动力头| 塑料化工储罐厂家| 按键寿命试验机| 不锈钢链板| 对夹式V型球阀| 上海圣刚机械| 十六烷基三甲基氯化铵| 玻璃雨棚| 自相关仪超短脉冲测量仪| 粮食安全快检仪| TRIMOS测长机| 德国VEM电机| 电液伺服扭转试验台| 步进行星减速机厂家| 电磁超声测厚仪| 总碳氢监测仪| 二维条码检测仪| 反渗透阻垢剂| 定制花键规| 运动地板厂家| 服装智能节拍|