日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Requirements of steel structure building for foundation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Requirements of steel structure building for foundation

Time:[2021-7-17]  Hits:2131

Requirements of steel structure building for foundation

The requirement of steel structure building for foundation is much lower than that of traditional concrete. What are the requirements of steel structure building for foundation.

The foundation selection of steel structure building is focused on its bearing layer, especially for some higher steel structure buildings, the foundation slab or pile end should go deep into the bearing layer. Therefore, the foundation of the same structural unit can not use both natural foundation and artificial foundation, and can not use two or more types of soil layers with large property differences as the foundation. Sometimes, in order to prevent the uneven settlement of the ground, the foundation will be deepened or the pile length will be increased.

Steel structure building, especially light steel building, can not be affected by any geological environment, whether it is wetland or arid area, can achieve the optimal construction conditions through construction, but also can save the construction period. Because of the superior seismic performance of steel structure buildings, we can see many steel structure buildings in some areas with high earthquake incidence. The whole installation process is convenient and the protection effect is good, but we need to take some targeted foundation stability measures and strengthen the integrity of the foundation. There may be liquefiable soil layer in the range of foundation bearing stratum in earthquake prone area, so some measures must be taken to eliminate the adverse effect of soil liquefaction on superstructure.

The following measures can be taken to eliminate the adverse effects of foundation soil liquefaction settlement on steel structure buildings

1. If pile foundation is used in steel structure building, the length of pile end extending into the stable soil layer below the liquefaction depth shall be determined according to the bearing capacity of pile, and all liquefiable soil layers within the foundation bearing layer shall be excavated.

2. Densification method can be used to eliminate the adverse effects of soil liquefaction, such as sand pile compaction method, dynamic compaction method, vibroflotation method, etc., so as to ensure the treatment to the lower interface of soil liquefaction depth.

Steel structure building can overcome all kinds of geological environment and ensure its superior performance of wind and earthquake resistance.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
高温中压输液泵| 自动焊接设备| 安全试验一体机| 蜗轮丝杆升降机| 铝包钢护栏网| 便携式医用冷藏箱| T2251N80T| 火锅底料搅拌炒锅(全自动电磁行星炒锅)百科| 纸管平压强度测定仪| 厂家| 冷光源植物生长箱| 在线监控保温箱| 气相三氧化二铝| PHOENIX| 尘埃粒子计数器| 管片螺栓厂家| 六价铬在线监测仪| 氧化钙厂家| 水文测验铅鱼| 浙江岛津| 激光焊接机| 全功能高压开关特性测试仪| 湿度传感器hmp60| 北京油烟净化器| 山东九州阿丽贝防腐设备| 家用小型电子台秤| 阿里巴巴信用贷款| 防爆检修电缆盘| 冰水冲击试验箱| 视频内窥镜| 细胞环境成像系统| 无锡工源危废暂存库| 高低温湿热试验箱| ADHS露点传感器| 标准型超声波液位计| SF52露点变送器型号| 旋球阀| 水泵维修| vaisala维萨拉变送器| 螺栓电加热器| 竖流式气浮设备|