Steel structure engineering foundation inspection General requirements

Time:[2016-3-2]  Hits:4384

Steel structure engineering foundation inspection General requirements

Guangzhou before the installation of steel structures to deal with the positioning axis, foundation and elevation axes, anchor bolt size and location of the building, etc. for review, and should be the foundation for the handover inspection and acceptance. Such as the need to review the bolt axis of each bolt, elevation that exceeds regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual drilling bolt position again.

Guangzhou Steel when foundation works in case of partial handover, handover acceptance each column base capable of forming at least a foundation degree space steel mounting unit, and should be consistent with the following provisions: foundation concrete strength to meet the design requirements; compacted backfill around the foundation end; bedrock elevation and symbolic reference axis point and accurate and complete; the top surface of the foundation should be flat, the foundation should look at the secondary irrigation cutting hair, anchor bolts should be intact.

The column axis position measured in column base outer shells.

The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base level design), the installation is a steel plate or early adoption sit pulp carrier plate leveling.

When using steel plate made of the support plate, the steel plate area should be based on lower compressive strength of concrete foundation, columns soles of the feet before the bottom of the column subjected to secondary grouting fastening bolt tension load and accounting determination. Pad in contact with the root surface and the bottom surface of the column should be flat, tight.

When the pulp should be used to sit for the board to shorten the no-mortar, mortar pads before lifting the column strength should be higher than a level foundation concrete strength and mortar pad area should be sufficient to meet carrier requirements.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
美国米顿罗计量泵| 离心脱泡机| 富森高压清洗机| 智能围界防范系统| EOCR电动机保护器| 防静电无尘服| 带电氧化锌避雷器测试仪| 易拉罐啤酒灌装机| 热水高压清洗设备| PPH缠绕吸收塔| 洁净间高效风口检漏仪| 油研流量控制阀| 邯郸通风管道厂家| DAGE4000推拉力测试仪| 红外一氧化碳分析仪| 油液颗粒计数器| 专业实验室设备生产厂家| 屏蔽泵厂家| 发酵用pH| RO反渗透纯水设备| 辛烷值测定仪| 芬兰Kibron| 光纤压力传感器| 人乳腺癌细胞MCF| 机架式氢气发生器| 防爆合格证| 三维检测| GPS北斗同步时钟| 直流式高压鼓风机| 膜材热封试验仪| 自动部分收集器| 人牙髓干细胞| 重庆抗震支架| LHH药品稳定性试验箱| 旋风式工业吸尘器| 伍德(天津)清洁设备| 固相萃取仪| 气味降低度| 单机除尘器骨架| 激光淬火| 汽车门锁测试盒|