日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > China's steel at the end of
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

China's steel at the end of

Time:[2016-1-30]  Hits:4255

Guangzhou Steel News: China's steel at the end of "Thirteen Five" expected to enter "Billion" Time

Guangzhou Steel News: Although the steel industry is now in the "frozen period" struggling, but reporters from the 2016 China Steel Development Forum held January 26 informed that in 2015, China's steel production of about 50 million tons to achieve the goal of doubling the "five" proposed; "thirteen five" is expected to double again by 2020 to more than 100 million tons.
According to experts, the "five-second" period, the proportion of China's steel steel steel production accounts for 5% to 6%, and in the towers, residential buildings and small and medium span bridges, the proportion of non-steel to 1%, far below the level of developed countries. Therefore, development of steel industry in our country huge space.
The forum proposed "Thirteen Five" China's steel industry overall roadmap and objectives of strengthening the supply side of the steel structural reforms, persist in innovation-driven, efforts to resolve the bottleneck restricting the development of the steel structure, promote the rapid development of steel construction and strive to achieve "thirteen five" period sTEEL amount exceeds 15% annual growth, rapid and healthy development, by 2020 more than 100 million tons.
At the same time, the Forum for the development of the steel structure put forward specific measures and recommendations: First, to strengthen top-level design and layout strategy, leading and exemplary role of the government role to cultivate steel market, increase policy support and strengthen supervision; second is to improve steel the whole industry chain, industry alliances and support leading enterprises, implementation of steel construction of pilot projects; third is steel related industries "going out"; Fourth, innovation-driven, focus on solving common key technical problems and personnel bottlenecks; Fifth new ideas and to improve the social and market acceptance.
The experts pointed out that "Thirteen Five" period, the steel structure is widely used in the construction field, to resolve excess capacity, promote industrial restructuring, accelerate the construction of new urbanization can play an important role. November 4, 2015, Chinese Premier Li Keqiang chaired a State Council executive meeting made it clear "The combination of canopy change and seismic and other housing projects, steel construction to carry out the pilot, and expand the use of green building materials", issued from the national level to promote application of steel sound. The next five years, steel will usher in a rare development opportunity.
21 academicians and more than 60 government leaders in charge, entrepreneurs, experts and scholars gathered in Beijing from the field of construction, steel structure development advice. Chinese Academy of Engineering, Chongqing University president Zhou Xuhong, Chinese Academy of Engineering, Tsinghua University, Professor Nie Jianguo, Chinese Academy of Engineering, Tongji University Professor by Shen Yan, president of China Steel Structure Association, Director of National Steel Engineering Technology Research Center, School of Metallurgical Construction Research Institute long FILLED were at the forum to do a special report. Forum by the China Academy of Civil Engineering, Department of Water Resources and Construction, China Steel Association, the National Steel Engineering Technology Research Center, jointly organized China Metallurgical Construction Research Institute Co., Ltd., Chongqing University, Tsinghua contractors.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
复合磨床| 不锈钢风刀清扫器| 蚀刻线自动加药系统| DKK| 化工输液泵| 高加速寿命试验箱| 高压开关特性测试仪检定装置| 熔体流动指数仪| 低温水浴振荡器| QJZ真空电磁| 全自动镜检仪| 推拉力试验机| 在线水中油分析仪| Parmer蠕动泵Masterflex泵管| 光化学氧气测量仪| 净化槽静音增氧泵| 接触角测试仪| NACHI进口轴承| 电动硬密封法兰蝶阀| 锥管| 步入式试验室| 凝胶行为分析仪| 闪蒸干燥机| 钠基膨润土防水毯渗透系数测定仪| PDT21差压变送器| 空调过滤网| 链板输送机| 方形冷凝器| 直流泄漏测试仪| 无线高压核相器| 广州新奥| 标准溶液定制| 工控机维修| 上海自仪四厂| 淄博越宏化工设备| 液化气泵| 岛津液相色谱仪维修| 辐射报警仪| 植保器材| 柔韧性试验仪| N9020B频谱分析仪|