raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4432

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
山东万晨环保| 维萨拉温湿度传感器hmp110| 恒温恒湿机| 智慧档案库房| 油液监测系统| 日本电色| 溶剂蓝| 北京铝蜂窝板厂家「生产加工定制」铝蜂窝板| 磁共振含油量测量仪| 威海珍珠棉厂家| NTN| 这些设备广泛应用于| beckman指封管| 护栏网| SEKO隔膜计量泵| N9020B频谱分析仪| 美国PARKER齿轮泵| 平弹垫三组合| 南京蓝恒环保| 拦截式| 低温控温仪| 盐雾箱| 上海贵尔机械| 插接式高强| 二手安捷伦气质联用仪| 部队文化建设| 四氟衬里| 油基荧光检漏剂| PVC管材挤出生产线| 食品净化厂房| 横河高精度功率分析仪| 干冰机厂家| 盐雾腐蚀试验箱| KRACHT流量计| 接线端子排| 三相温升大电流发生器| 工业滚珠直流风机生产厂家| omega热电偶测温线| 奥豪斯离心机| 波峰焊| RFB液流电池测试台|