Steel supervision next station control points

Time:[2016-1-20]  Hits:4356

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
mercer默瑟安全阀| 链条导轨| 高压清洗机| 滤袋式工业吸尘器| 多盘式真空过滤机| 高分子絮凝剂| 线性热板| 高杆灯厂家| 教学用原子力显微镜| 着色剂专用色谱柱| 环境工程实验装置| 25ml| 六氟化硫检测仪| 卧式注塑机| 小松| 不锈钢焊接叶轮| 手持式气溶胶监测仪| PIKE溴化钾| 高压氮气减压器| 意大利DIELL传感器| 便携式瓦斯继电器校验仪| 看守所围墙网| 肌醇烟酸酯| 出租机械车位| 回转炉| 精密数控平面磨床| 一步法Elisa试剂盒| 高性能空心阴极灯| 扭力矩扳手| 驱动器| 平板拉丝机| SEDEX75蒸发光检测器| 隔爆双金属温度计| 矿泉水瓶破碎线| 专业冷却塔降噪隔声| 通风柜厂家| 台式高速冷冻离心机| 电动座椅调节功能试验机| 国产分光光度计| 臭氧监测| 二联件|