日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel tells you: fireproof coatings inspection process after construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Time:[2015-8-12]  Hits:4737

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Fireproof coatings as a construction material in the construction is completed this process must be tested, then test for fireproof coatings how have requested it, following Guangzhou Steel come to find out.

1, fireproof coatings test should provide the following reports:

(1) fire-resistant fire retardant coating countries view the institution of the limits to view reports and view reports of physical and chemical properties, fire supervision department issued a production license and production of the factory's product certification;

(2) the construction site to view the document and quality management during the construction process submissions major questions;

(3) See shaded engineering inspection items inspection records;

(4) completion report after the completion of the single and self-test report;

(5) the amount of purchase orders fire retardant coating;

(6) Fire paint coating edge construction side view records.

Fireproof coatings should be included in the "construction of fire facilities View order", "construction project fire inspection norms" and other technical specification, all painted interior and exterior coating of steel structure fire test before the completion of construction, the agency must have a view of the steel body structure fire retardant coating to view compliance report. Fireproof coatings viewing and inspection is mainly based on: GB14907-2002 "steel structure fire general technical conditions", GB50205-2002 "steel works and construction quality inspection norms", CECS24 "fireproof coatings technical specifications." Guangzhou Steel steel structure fire fire resistance of measuring methods, should be based on the type of environment and concluded by the fire, such as: petrochemical enterprises to use fireproof coatings, its fire resistance test should be based on temperature curve hydrocarbon fire determined before more realistic.

After brushing fire retardant coating on steel, greatly improving the fire resistance of steel, but in fireproof coatings applications, there are coatings improper selection, poor construction management, completed inspection, viewing and many other non-standard questions , seriously affecting the quality fireproof coatings.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
西门子电动温控阀| 机械式张力仪| 太阳能教学实训台| 直流电源校准器| 智慧档案库房| 透明质酸酶牛源| 土壤有机碳消解器| TKWL天康物位计| 原位压力机| 全铝家居招商加盟| 反渗透设备| 电力计量箱| 美国PARKER电磁阀| 德国SICK西克编码器| 省煤器生产厂家| G10环氧管| 糖原pas染色试剂盒| 算盘轮| 牵引机租赁| 餐厨垃圾处理解决方案| 温室育苗洒水车| 高压差分探头| 180度剥离试验机| 耐酸碱电磁流量计| 美国Seroat高压灭菌袋| 服装流水线| 多工位电池片焊带拉力计| 广州弹簧| 变压器油滤油机| 输配电线路在线监测| 剩余式电气火灾监控探测器| 船用电缆厂家| 实验室智能硬件平台| 单机除尘器骨架| 电磁溢流阀| hdpe钢丝网骨架塑料复合管厂家| 多通道涡流探伤仪| 冷媒检漏仪| 三洋二氧化碳培养箱| 不锈钢链板| 单开道岔|