日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:4982

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
石墨电热板| 电磁超声腐蚀测厚仪| 海事卫星电话| AO一体化污水处理设备| 皮革物理性测试仪| 管道防腐| UNiMAX熟料| MKY| LUBRICANT润滑剂| 波峰焊| 电子吊秤(仪器设备)百科| S520便携式露点仪| 西门子料位计| ypc电磁阀| 液相色谱仪梯度系统| 钢套钢岩棉保温管| 无线数显水平仪| 租用机械式立体停车位| LED光电试验箱| 固相萃取仪| 高气压气体流量计| 表面活性剂1631溴型(十六烷基三甲基溴化铵)| 普发检漏仪| 意大利Nuova阀门| 不锈钢电阻| 亨士乐计数器| SQS泡沫起升仪| 国电南自PST693U| 高温恒温房| LED防爆灯| 8103560油检测盒| 试验室减压器| Y型气动三通换向球阀| 铝合金隔膜泵| 四氟绝缘垫片| 博利源潜水泵| 接地电阻测试仪[厂家直销]| 中国机械通用零部件工业协会| 彩色透水地坪价格| 方形铸铁镶铜闸门| 浮游生物鉴定仪|