日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use

Time:[2015-6-24]  Hits:4703

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
   
June 16, the third China Expo South is concluded, marking the construction of the Dianchi Lake in Kunming World Steel Works Exhibition Center project successfully put into use, and set to open steel big screen debut "Peacock" in the face of domestic and foreign visitors to the exhibition style. Guangzhou Steel
Dianchi Lake in Kunming World Exhibition Center project Steel Works Co., Ltd. invested by the construction of a Yunnan, Ltd. is responsible for the outer steel mesh deepen the design, manufacture, installation.
It is reported that the world's Convention and Exhibition Centre, Kunming Dianchi steel mesh semicircular distribution to the peacock as prototyping, volume 1.1 million tons, the use of domestic rare, Yunnan's first variable cross-section of bending and torsion of thin-walled shaped space fully welded structure, application of bending and torsion member total of more than 4100 pieces, bending and torsion ranks first in the number of components as much as similar projects in the country, and the viewpoint of bending and torsion of each member, there was no common direction. Especially in the main hall of the sequence of two vases, bending twist unprecedented degree, described as "like a column of non-column, non-beam like beam." Vases, 24 meters high, each 123 vases made of steel components assembled, each bar weighing 163 tons, the degree of bending and torsion vases shall also be a Yunnan most. The project was September 27, 2014 began lifting, and on January 29, 2015 two days ahead of the cap, which took 125 days. Guangzhou Steel
Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
磁浮子液位计| 水质急性生物毒性测定仪| 西门子雷达物位计| 树木测径尺| 全自动煎药机| 芯式过滤器| PCB力锤传感器| 调频式串联谐振变压器| 中效| 专业voc检测机构| 安徽耐磨热电阻| 农残分析气相色谱仪| 自动水分测试仪| 锌钢市政护栏| 伺服电机维修| 养殖场污水处理车| IP内部通信对讲终端| 钢板网护栏| elisa试剂盒供应厂商| 玻璃钢防雨式令克棒| 0AB0| NOISEKEN静电枪| 水车专机| 溶解氧电极传感器| 工业防爆| 数控机床机械手| 涂层测厚仪| 低背隙蜗轮减速机| 数显电气仪表| 移动| 聚乙二醇二甲基丙烯酸酯| 455升电热水器| 防爆四合一气体报警器| 毛发研磨仪| BQC(BQD)防爆电机控制器| 槽钢冲孔机| 原钙黏素1ELISA试剂盒| 改性乳化沥青设备| 换向阀| 双通道中心| 齿轮轴|