日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel news: construction steel components assembled provision
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Guangzhou Steel news: construction steel components assembled provision

Time:[2015-5-20]  Hits:4181

Guangzhou Steel news: construction steel components assembled provision

Assembly platform, mold, etc. should be smooth and firm, in order to ensure the accuracy of the assembly member.
Necessary reference to the drawings, processes and quality standards, and the characteristics of the coupling member, the corresponding assembly measures.
Should consider the possibility of welding, welding deformation is minimized, and easy to correct to conclude that taking one or more assembly assembly, that is, first assembled, welded into a number of parts, and were correct distortion, and then assembled into components.
Welding should consider shrinking margin after welding allowance.
All parts of the process should check its standards, size, quantity meets the requirements, all parts and components to be corrected, connecting the contact surface and along the inner margin of the range of 30 ~ 50mm weld rust, burrs, oil, ice should be clean and clear.
Where the hidden parts after assembly, shall be subject to confirmation QC qualified to carry out welding or external hidden. After assembling the first batch of members, shall be subject to a comprehensive inspection QC qualified confirmation before continuing assembly.
If students splice splice, in order to reduce welding stress, easy to correct deformed, should stitching, welding, the test, qualified after the correction, and then assembled.
Structure should be based on factors, welding method, welding sequence, etc., determine a reasonable order of assembly, generally advised major parts, after minor parts, the first intermediate ends after the first horizontal-vertical, outside after the first interior, in order to reduce distortion.
When the clamp assembly, when the removal of the fixture can not be shot down with a hammer, cut gas cutting applications, they are not to damage the base material of the remaining burr, slag grinding should be clean.
Steel splice width of not less than 300mm, length less than 600mm; steel splice length of not less than 2 times the cross-sectional diameter or the long side, and not less than 600mm. All are full penetration welding seam weld on the fight, qualified 100% ultrasonic testing; thickness ≤8mm, by other methods (X-ray or drilling, etc.) check. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
橡胶拉力机| 流动光化学反应器| ELECTROSWITCH开关| 非标液氮容器研发| 复合肥水分仪| 高气压气体流量计| 恒温振荡水浴装置| 计算机断层玻片扫描仪| 超声波振动筛| 加拿大AffinityImmuno试剂盒| 危废化工桶| 德国BYK光泽度仪| 拉伸机| 拼装罐| 辐射巡测仪| 上海INA进口轴承| 电磁阀防爆线圈EM551090| 舜宇荧光显微镜| 纺织品光蓄热性测试仪(透气包装材料微生物屏障分等仪)| 柔性耐高温云母板生产厂家| 高智能土壤养分检测仪| 金属卤素灯老化试验箱| 肉类水分快速测定仪| CASELLA科赛乐| BURKERT膜片阀| 江苏)螺杆真空泵直销| 京东方工控液晶屏| 广州新奥| WILKERSON威尔克森| 液槽冷热冲击试验箱| 二手集装箱| kromasil| GMP医药纯化水设备| 看台膜结构| 吹气式热电偶| 毛细吸水时间测定仪| 420电热恒温水槽| 新能源电缆设备| 气体检测仪检定装置| 瑞士Kistler奇石乐传感器| 耐划伤测试仪|