Steel works construction schedule control content

Time:[2014-11-15]  Hits:5027

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
钢格板厂家| 人防空气毒剂监测仪| 食品拍打式无菌均质器| 川熙流体设备百科| 化学铜控制器| 数显推拉力计| 防腐带| 码头吊机| ATEX防爆风速仪| CPVC泰勒花环填料| 双叶轮鼓风机CX| 气动闸阀| 英思科MX6| QNIX菲尼克斯膜厚仪| 4200生物分析仪| 电梯绳头组合| 丝攻研磨机| 温湿度记录纸| 硬齿面减速机「型号全」| 动物油酸| 煤炭元素检测仪| 生物质燃料热值测试仪| 法兰连接型电磁流量计| 离子交换层析检测仪| 通孔增量编码器| 灼热丝试验仪| 不锈钢储热式工业| 一氧化碳检测仪| 意大利DIELL传感器| 气相玻璃填充柱| pph止回阀| 等离子体清洗机| 无堵塞潜水排污泵| 三丰三坐标| 均质袋架| 压力抗栓泵| 临沂亚克力发光字| 药粉振动筛| 斜齿数控车床| 仪器回收| 低烟无卤电缆料造粒机|