日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Prestressing steel reinforcement program
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Prestressing steel reinforcement program

Time:[2014-9-3]  Hits:4173

Prestressing steel reinforcement program

[Problem] prestressed reinforcement steel student program?
[Answer] prestressing steel reinforcement and construction technology program:
Prestressing steel reinforcement program can be divided into two types, one is directly attached to the law, will be anchored at both ends and prestressed by adhesive paste on the surface of steel structures; generally applicable to the component surface relatively flat rod, for members or its local reinforcement; Second, adjust the beam as a prestressed cable stress, generally applies to the overall strengthening of the entire structure.
1, material: carbon fiber structural reinforcement for the main choice of PAN-based carbon fiber, the ultimate strength of up to 3500MPa, the elastic modulus of about 2.35 × 109MPa class of materials with epoxy resin system.
2, Design: According to the mechanical characteristics of the structure to be repaired, the force transmission path and the stress - strain field, to determine the amount of fabric, size and laying direction. Fiber orientation should be consistent with the injuries the largest component force direction. If the injury site in a complex stress state, the fiber orientation and stacking sequence should be consistent with the control of the main stress direction.
3, embedded tensioned prestressed technology: Foshan Steel reinforcement particularity prestressing need a simple way, the traditional way is often the first prestressing tension after anchoring, require relatively sophisticated tensioning equipment, and the corresponding reaction force means. In Anchorage, when the prestressing loss is relatively large. Embedded prestressed tension technology, after its characteristics is the first anchor tensioning to members and former anchor itself as a tensioning force device without complicated tensioning equipment. Tension is applied to the embedded technology can be divided into sub-prestressed prestressed, can produce an adhesive layer extrusion effect, improving the reliability of paste. Meanwhile, due to the use of the first anchor tensioning technology, small prestress loss, the method is simple and effective.
Above all finishing work according to the problem encountered in the actual participants made ​​reference, any questions, please timely communication, correct me.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
婴儿床冲击试验机| 工业气体在线分析仪(激光拉曼气体分析仪厂家)| 干式器恒温金属浴| 一体化孔板流量计厂家| 临沂三菱中央空调| 二手浓缩提取机组| 有源电力滤波柜| 表盘气动量仪| 罗斯蒙特变送器原装进口| PE棒| 罗茨螺杆泵真空机组| 全自动旋转振荡器| 无轨平车生产厂家| 同位素标记化合物| 智慧用电监测装置| 美国PE光谱耗材| 碳足迹碳核查服务| 岳信仪器| 水滴角测试仪| 不锈钢厚壁管| 多肽研究| 600数显电热恒温水槽| 机床工作灯| SV630B莱宝真空泵| 卧式离心机| 公路护栏网| marposs定制检具| 德国cmc微量水分析仪| ITT防水连接器| 光合测量仪| 炭黑含量测试仪| 美国GE氧传感器| 控氧氮气柜| 探伤机耗材| 智能射频导纳料位计| 油冷式电动滚筒| 移动登车桥| 不锈钢球| Venture| PHOENIX| 汽车尾箱锁测试盒|