日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > Multi-storey and high-rise steel column base grouting requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

Multi-storey and high-rise steel column base grouting requirements

Time:[2014-8-27]  Hits:4565

Multi-storey and high-rise steel column base grouting requirements

[Student] multi doubt rise steel column base grouting and regulations?
[Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom end of the steel column column grouting, grouting way is to stand around in the column foot template, based on a clean surface to clear, and then polymerized with high strength mortar poured from the Liberal side to dense, after filling with wet straw bags or sacks conservation.
Above all finishing work according to the participants encountered in actual questions from, for reference, if in doubt please timely communication, correct me. Foshan Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
组氨酸生产厂家| 网站建设制作| PDS863液位变送器| 便携式溶氧仪9011M| 科研级红外热像仪| 光化学监测网| 上益教育设备| 叉车出租| 铜丝网| 小型| 威固德防爆型电动执行器| KOZE电导仪| 离心通风机| 高压釜| 数控四柱液压机厂家价格| KAIJO凯捷| 多路电池测试仪| 削片机价格| 力士乐电磁阀| 运动控制卡| PE一体化污水处理设备| 时代里氏硬度计| 低温光照培养箱| 长沙机床配件| 数控随动磨床| 内窥镜冷光源检测仪| 微机继电保护校验仪| 亚泰电子调速仪表| 不锈钢焊管| 超声波高温高压反应釜(微型磁力搅拌| 匠客工程机械| 浦怡百科| 电子地磅控制器(无线)| 医用冷藏冷冻箱| 北京林克曼| 西门子液位计流量计| 防水涂料价格| alpco抗体| 切削液废水处理设备| DLPCA| Syncronis|