日韩精品一区二区三区四区蜜桃,欧美专区,亚洲AV超清无码不卡在线网络,精品成在人线AV无码免费看

Language:CHINESESENGLISH

Home > News > The main problem of development of the domestic steel industry exists and Analysis
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.hycjk.com

The main problem of development of the domestic steel industry exists and Analysis

Time:[2014-6-25]  Hits:4839

The main questions and analyze the development of the domestic steel industry exists

Fit for the steel industry is energy-saving environmental awareness and sustainable development-oriented industries also be on improving. Government and research institutions in recent years, Japan, Canada, Britain and other countries published many articles devoted to the development of steel structure housing the advantages and measures.

Less steel research and development funding, standards and standards revision cycle is too long; standards and application of standards, procedures missing items, lag; steel standards and project planning, construction connection is not on standard protocols.

 

Foshan steel construction and installation of the company's processing plants and equipment, computer management, labor productivity need to be further improved and enhanced.

Steel lack of professional and technical personnel, especially in small and medium companies more missing. Product quality and management can not meet the needs of the market.

Industry associations and functional effects far place. In particular, the standards and guide the market order, service companies, steel market open areas, preparation of revised standards and training standards and other professionals is still a lot of work to do.

Planning concept and market demand. Such as the current super-tall buildings and most of the special requirements of the bid by a foreign architect planning program, although they do have in common planning concepts, but the connection node was too cluttered, not only supplies, but also for the production and installation brings Many problems, so that the project cost is too large.

Parts of the steel company blind horse, herd instinct, resulting in overcapacity households, wasting a lot of capital. Combined with steel prices, disorderly market competition, competing prices down causing loss of processing and installation.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
小麦种子加工机械| 防爆氟利昂气体检测仪| 轻质防爆墙施工安装| CoresepSB| 电液伺服动态疲劳试验设备| 排沙排泥泵| MT2系列振动速度传感器| ATOS电磁阀| 三相五柱电压互感器| 扁形方框式除尘滤板| 恶臭监测仪| BTL位移传感器| 双层卸灰阀厂家| 潜水搅拌机(用于工业污水| 浇筑式防水母线槽| KIMO凯茂变送器| 等离子体清洗机| 调心滚子轴承| 无管道净气型试剂柜| 40电缆滑线导轨| 智能平板导热仪| 裂解炉专用热电偶| 滨州地坪漆| Y型气动三通换向球阀| 自动烟尘烟气测试仪| IP互联通信系统| 低速离心机| BBS防凝露封堵剂| 聚乙烯逃生管| VSE威仕流量计| EMS实验室试剂| 单锥螺带干燥机| 板式换热器| 湿热高低温试验箱| 发气量检测仪| 射线剂量率仪| 核辐射检测仪| 高承载植草地坪| 锘森双进风鼓风机| 气体检测仪| 尼龙调湿增韧处理箱|