Key Points of Column Installation in Steel Structure Workshop Construction

Time:[2022-12-24]  Hits:2123

The steel column is one of the main components of the steel structure plant. As its name implies, the steel column is a column made of steel. There are two types of section forms - solid web column and lattice column. For the steel column device, the component shall be rechecked after mobilization and during installation, and the number, size, shape, connection hole orientation and other attributes shall be consistent with the drawings one by one before the component device construction.

 

 

1. Elevation observation points and center line signs shall be set before the installation of steel column components. For a plant project, the observation points and signs shall be set in the same direction, and shall conform to the following provisions:


First of all, the setting of elevation observation points shall conform to the following provisions: the setting of elevation observation points shall be based on the bracket (shoulder beam) bearing surface, and shall be set at the position convenient for observation of the column; For column without bracket (shoulder beam), the center of the top device hole connecting the column top and the truss shall be taken as the benchmark.


Then, the setting of center line sign shall conform to the following provisions: a center sign shall be set in the direction of the upper line on the surface of the column base plate, and a center sign shall be set on both sides of the line direction; A center line shall be set at the upper line and column line direction of the column body, and a center mark shall be set at the bottom, middle (bracket or shoulder beam) and top of each center line; The double bracket (shoulder beam) column is set with center marks on the outer surface of the two column shafts in the line direction.


2. During the construction of steel structure plant, the multi section column device shall be assembled into a whole and then hoisted.


3. The correction of steel column device shall comply with the following provisions: eliminate the deviation caused by side sunlight; The verticality deviation of the column shall be controlled according to the temperature (season). After the crane beam, roof truss device and crane beam are adjusted, fixed and connected, the steel column shall be retested, and those exceeding the allowable deviation shall be adjusted in time.


4. For columns with large slenderness ratio, temporary fixing measures shall be added after hoisting.


5. The installation of inter column support shall be carried out after the alignment of columns, and the inter column support shall be installed under the condition of ensuring the verticality of columns.


Quality is the life of construction projects. Quality is the first priority in the construction of steel structure workshops. Only quality is the first, can an enterprise have a long term. Only good process methods and correct and reasonable operation methods can ensure the high-quality completion of the project.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
PerkinElmer珀金埃尔默石英矩管| 二次供水水质多参数| 气动水泥蝶阀| 服装流水线| 数显式通球指示器| 水质在线臭氧分析仪| 上海家君真空仪表| 克罗尼流量计| 波顿BOTON齿轮箱| 昆虫标本盒厂家| LAB老化实验箱| LARRY烧烤炉| 铝无缝管| ELAFLEX接头软管| 氧化沟潜水推流器| 租用机械式立体停车位| 塑料悬臂梁冲击试验机| 山东环氧地坪| 电液伺服扭转试验台| 全自动粘度仪| 电杆荷载挠度测试仪| 电磁离合器制动器组| 2088型压力变送器| 夏比冲击缺口测量仪| 透浦式中压鼓风机| 翅片管暖气片生产厂家| 光纤放大器| 高速精密冲床| 反渗透阻垢剂| 梁山鲁德二手设备百科| 液压制动器型号| 重介质旋流器维修| 夏比冲击缺口测量仪| 空气弹老化箱| 蒸馏水机| 铜合金成分含量分析仪| 数显火焰光度计| EOCR| 美国HASKEL| 茶叶专用柱| 防爆温湿度探测器|