Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1766

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
无损探伤设备网| 美国PARKER齿轮泵| 宁波铝棒价格| 二甲苯浓度超标报警器| 汽车座椅静强度试验机| HA0503200| 继电保护校验仪| 企业电力微电网平台| 山东钢木实验台| 超高压耐压测试仪| HORIBA指示变换器| 十四经穴针灸铜人| SHELDON培养箱| 搪瓷反应罐修补| 瓦温热电阻| 一比多| 皮革耐折试验机| 中国农业机械化信息网| 便携式高压试验变压器| 山东40Cr大口径合金管| 药物锥入度测定仪| 瓷珠菌种保存管| 宝德上海办事处| 石家庄轻钙厂家| 物联网高低温试验箱| 手持式七氟丙烷检测仪| 连续式酒精回收塔| nalgene量筒| 综合流量校准仪| 西原环保| SC气缸| 停车库安装拆除| 磁栅尺| 大巴车| 超重型斜床身铣打机| 数显扭力扳手| 橡木颗粒制品批发厂家| 催化评价在线色谱仪| 绵羊白介素1β检测试剂盒| 空冷器「源头厂家」| 伺服驱动器维修|