Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2033

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
热电石墨管| 专注于家庭电器电子设备汽车使用与维修知识分享平台!| 智能围界防范系统| 美国米顿罗计量泵| 全波长酶标仪| Pyroskop840| 危废化工桶| 大屏负氧离子监测设备| 岩石万能变角剪切试验机| 宁波新芝超声波细胞粉碎机| 双层框式搅拌机| 美国MAC脉冲阀| 无组织排放监测系统| 自动沸程测定仪| 螺带混合机| 采血称| AVENTICS气缸| 包馅机| 还原柱| 临沂核心价值观生产厂家| 高速连续曝光| 蔬菜漂烫杀青机| 不锈钢热交换器管| 回流焊机厂家| 等度高效液相色谱仪| 楼板测厚仪| 精密数控平面磨床| 电缆交流打压设备| 体育场围栏| 金属套玻璃雾化器| EBM轴流式风机| 超声波均质| 默克薄层层析硅胶板| 猴车托轮| 真空感应悬浮炉| 全铝家居招商加盟| 筑鼎化工设备| 机械车位租赁[重庆甘肃贵州云南二手停车场设备出租]智能车库投资建设| 粉尘爆炸试验| 生产厂家| 磁力起动器|